§ 7263

Added by Stats. 1970, Ch. 1498.

The sequence of erection, bolting, temporary guying, riveting and welding shall be such as to maintain the stability of the structural frame at all times during construction. This applies to the dead weight of the structure, plus weight and working reactions of all construction equipment placed thereon plus any external forces that may be applied.

This content is for reference, learning, and study purposes only. All legal text should be verified against the official California Legislative Information website, which is the authoritative source for California law. Data last processed: February 15, 2026.