§ 2842.2

Added by Stats. 2007, Ch. 713, Sec. 1. Effective January 1, 2008.

The commission shall ensure that an electrical corporation utilizes long-term planning and a reliability assessment for upgrades to its transmission and distribution systems and that any upgrades are not inconsistent with promoting combined heat and power systems that are cost effective, technologically feasible, and environmentally beneficial, particularly as those combined heat and power systems reduce emissions of greenhouse gases.

Other sections in Article 1 - Waste Heat and Carbon Emissions Reduction Act

This content is for reference, learning, and study purposes only. All legal text should be verified against the official California Legislative Information website, which is the authoritative source for California law. Data last processed: February 15, 2026.