the regulatory costs incurred by the state in conducting the activities described in subdivision (a). Each underground gas storage facility operator shall pay a proportionate share of the total regulatory costs projected for each fiscal year based on the field capacity and number of wells for each underground gas storage facility. For each underground gas storage facility, the portion owed by the operator shall be computed by multiplying the operator’s field capacity by the number of the operator’s wells, and dividing that product by the statewide sum across all underground gas storage facilities of the product of the field capacity of each individual underground gas storage facility multiplied by the number of wells at that facility.
hazard to public health and safety, property, or to the environment, there shall be an additional charge imposed entirely on the operator of the underground storage facility at which the uncontrolled leak or release of gas occurred. The charge shall be in the amount of the total directly associated costs incurred by the division in the previous calendar year in the course of responding to the release, including personnel hours, travel expenses, contracting costs, and any other directly associated costs incurred by the division.
underground gas storage facility except those that have been plugged and abandoned pursuant to Section 3208 before the preceding calendar year.
Cite this section