§ 79290

Added by Stats. 2022, Ch. 257, Sec. 2. (AB 2293) Effective January 1, 2023. Operative January 1, 2024, pursuant to Sec. 4 of Stats. 2022, Ch. 257.

To the extent consistent with the federal Resource Conservation and Recovery Act of 1976, as amended, (42 U.S.C. Sec. 6901 et seq.), the department may exclude any portion of a response action conducted entirely onsite from the hazardous waste facility permit requirements of Section 25201 if both of the following apply:

(a)The removal or remedial action is carried out pursuant to a removal action work plan or a remedial action plan prepared pursuant to Article 12 (commencing with Section 79195).
(b)The removal action work plan or the remedial action plan requires that the response action complies with all laws, rules, regulations, standards, and requirements, criteria, or limitations applicable

to the construction, operation, and closure of the type of facility at the hazardous substance release site and with any other condition imposed by the department as necessary to protect public health and safety and the environment.

Other sections in Article 14 - Onsite Hazardous Waste Facility for Response Action

§ 79290§ 79295